CE05 - Une énergie durable, propre, sûre et efficace 2024

Cold CO2 in Hot Reservoirs: Well Integrity in Carbon Capture and Storage – ColdWell

Submission summary

Carbon Capture and Storage (CCS) is a solution to mitigate emissions from large-scale fossil energy and industrial sources. However, widespread implementation hinges on overcoming significant challenges. The global landscape of CCS has experienced notable growth in the past five years, driven by private sector response to public demands for a transition to a net-zero emissions future, as well as shifts in government policies and increased investments worldwide.
For many regions, particularly in Europe, offshore storage emerges as the preferred choice, with transportation by ship offering compelling advantages, including reduced capital expenditure, lower financial risk, and heightened flexibility. A critical aspect of ship-based CO2 transport is the extremely low temperature required (-53°C at 7 bar) to maintain it in a liquid state.
Injecting such a cold fluid into a reservoir with temperatures typically between 70°C and 200°C raises serious challenges, particularly for ensuring the well integrity, notably its main sealing element—the cement sheath. Identified risks include casing debonding, thermal fracturing, and the potential formation of CO2 hydrates and ice within the reservoir rock, cement, or caprock.
The current project is dedicated to advancing the understanding and conducting a quantitative analysis of wellbore integrity during cold CO2 injection into a high-temperature reservoir. A multidisciplinary and multi-scale research program covering various methods and tools has been established. These range from thermodynamics and molecular dynamics simulations addressing CO2 hydrate formation to laboratory experiments characterizing casing/cement/rock interfaces, along with developing a laboratory-scale physical model of the well structure and numerical simulations at the wellbore scale.

Project coordination

Siavash Ghabezloo (Laboratoire Navier)

The author of this summary is the project coordinator, who is responsible for the content of this summary. The ANR declines any responsibility as for its contents.

Partnership

NAVIER Laboratoire Navier

Help of the ANR 592,820 euros
Beginning and duration of the scientific project: March 2025 - 60 Months

Useful links

Explorez notre base de projets financés

 

 

ANR makes available its datasets on funded projects, click here to find more.

Sign up for the latest news:
Subscribe to our newsletter